Fraser Randall were appointed to structure, manage and cost control the build of the semi-permanent ‘E.ON Open House’ project which was conceived after customer feedback determined that they would prefer to deal with E.ON face to face. As the first utility with a high street presence since 1999 a six month trial concept store was created in E.ON’s home town of Nottingham.
RPM