Location: London
Services: Project Management
Value: Undisclosed
Completion: December 2017
The management of the refurbishment of this six floor town house into contemporary work spaces involved the strip out of redundant offices, returning it back to the original building fabric; structural penetrations to create new openings for feature staircases and skylights were introduced, bringing natural light into the building.
New Cat A and B fit-out and new MEP was introduced throughout the building. With on-site construct limited to a 14 week timeframe this fast track refurbishment was meticulously planned.